Filed under gbt-35273
Every brief tagged "gbt-35273".
- § 01 · GBT-35273
From Consent to Governance: What the 2026 Draft Revision of GB/T 35273 Changes Against the 2020 Standard
On June 17, 2026 the National Cybersecurity Standardization Technical Committee (TC260), with CESI as drafting lead, released for public comment a systematic revision of GB/T 35273 — China's most-cited personal-information standard, the de-facto 'small PIPL.' The draft retitles the standard from 'Information Security Technology' to 'Data Security Technology' and expands its normative references from one standard to eight. DCC reads the revision as a role change, not a clause count: the standard moves from a consent-and-notice manual into a governance-capability framework. The substantive increments against GB/T 35273-2020: a new Chapter 5 importing PIPL Article 13's seven lawful bases as a standalone chapter with hard boundaries on each (contract-necessity, HR, public-disclosure) plus an evidence-chain duty; a sensitive-PI redefinition aligned to PIPL Article 28 with a new aggregation rule (multiple items that together meet the threshold are treated as sensitive as a whole); a formal 'separate consent' definition (3.7) with a negative list; a new eighth basic principle, 'quality assurance' (Chapter 4(f)); dedicated AI clauses on the collection side (6.7), in minimum-necessity (6.1 d–f), in aggregation/training (8.4), and a new generative-AI use clause (8.5.4) with output review and a 15-working-day deletion SLA; a unified-account-system clause (8.6) aimed at one-account-many-products groups; a terminal/IoT collection clause (6.8); a wholly new Chapter 11 on overseas-jurisdiction determination and conflict handling; and a systematized internal-control chapter (13) covering the person in charge of personal information protection, working body, processing-activity records, impact assessment, and a GB/T 46903-anchored compliance audit. Subject-rights response time tightens from 30 days to 15 working days. Clause numbers are from the comment draft and are not final; formal release is expected after 2027.